Pinterest • The world’s catalog of ideas

vertical frame cable railing. designing a railing using vertically run cables as in-fill. Top and bottom rails are necessary in a vertical railing using cable,because mounting and tensioning hardware is attached to top and bottom rails instead of end posts. We recommend schedule 80 pipe or 2"x2"x1/4" square tubing for both the top and bottom rail, because of the forces applied when the cables are properly tensioned.

19
1

PVC and CPVC Pipes - Schedule 40 & 80

Schedule 40 vs. Schedule 80 Pipe Not all pipe is made the same. We ONLY use Schedule 80 pipe. Any structure I've seen with lengths greater than 4 feet who tried to cut costs by using Schedule 40 pipe has proven to be a structural nightmare. Tons of bending."

The Badger Meter wireless 228PV flow sensors are designed to measure water flow in PVC pipes. These sensors consist of a removable, nonmagnetic sensor in a schedule 80 PVC tee with solvent-weld socket end connections. They are available in 1-1/2" to 4" sizes.

from eHow

What Is the Difference Between Schedule 40 & Schedule 80 Pipe

What Is the Difference Between Schedule 40 & Schedule 80 Pipe?

1

My foreman says he thinks you can make these with Schedule 80 PVC for the gray color--I think this is so cool!

16
3
1

2g and 5g bend test schedule 80 pipe tig all the way baby