Explore Building Code, Educational Videos, and more!

Explore related topics

Building codes clarified introductory to videos - YouTube

Building codes clarified introductory to videos

ARE 4.0 Building Systems (BS): Multiple Choice - YouTube

In this video, we’ll take an inside look at the multiple-choice section of Building Systems. Learn about the division’s content, test your knowledge with sam.

Boat footing: Similar to a mat footing, except it is placed at a depth such that the weight of the soil removed from the excavation is equal to the load of the building, and thus little or no new load is added to the underlying soil.

Boat footing: Similar to a mat footing, except it is placed at a depth such that the weight of the soil removed from the excavation is equal to the load of the building, and thus little or no new load is added to the underlying soil.

Mat or Raft foundation: One large footing under the entire building that distributes the load over the entire building area when soil conditions are poor.

Mat or Raft foundation: One large footing under the entire building that distributes the load over the entire building area when soil conditions are poor.

building section part1.avi - YouTube

building section part1.avi - YouTube

ARE 4.0 Building Systems (BS): Mechanical & Electrical Plan Vignette - YouTube

ARE Building Systems (BS): Mechanical & Electrical Plan Vignette

NCARB YouTube Channel

NCARB YouTube Channel

Architectural Acoustics 1 of 4: Sound and Building Materials - YouTube

Sound absorption, sound reflection, and sound transmission through building assemblies

GRADING WHY CANT WE MAKE SEPERATE CONTOUR CIRCLE FOR PAD?! -contour lines as close to building as possible  -keep fingers close 	    PLANNING  buildings 	2-should face street entrance must be visible from (hint - it’s recessed) 		 parking 	17adjacent to curve of road, no space buffer 	18parking h

GRADING WHY CANT WE MAKE SEPERATE CONTOUR CIRCLE FOR PAD?! -contour lines as close to building as possible -keep fingers close PLANNING buildings 2-should face street entrance must be visible from (hint - it’s recessed) parking 17adjacent to curve of road, no space buffer 18parking h

Pinterest
Search